报告清单
我的报告
[35]Method for determining the time of the first overhaul taking into account preventive maintenance
Guiwen Yang Student Beihang University (Beijing University of Aeronautics and Astronautics)
仅限参会人 口头报告
[34]Study on Monitoring Reliability of Flexible Eddy Current Sensor in Variable Temperature Environment
chengjie ping Doctor Air Force Engineering University
仅限参会人 张贴报告
[33]An LLM-Agent and Knowledge Graph–Integrated Framework for Collaborative Optimization of Hydropower Maintenance Resources Scheduling
Xinyang Yi graduate student Huazhong University of Science and Technology
仅限参会人 口头报告
[31]Acoustic Emission-Driven Change Point Detection in Composite Joints based on Markov Chain Monte Carlo
Qian Li Ph.D Student Beihang University
仅限参会人 口头报告
[30]An Image-based Method for Evaluating the State of Carbon Deposit on Contactor Rail
Ruixiang Hu Mr. Beihang University
仅限参会人 口头报告
[27]Research on the Development Technology of Remaining UsefulLife Prediction Model for Reactor Coolant Pump Bearings
Renyi Xu Engineer Science and Technology on Reactor System Design Technology Laboratory Nuclear Power Institute of China
仅限参会人 口头报告
重要日期
  • 会议日期

    08月01日

    2025

    08月04日

    2025

  • 07月04日 2025

    初稿截稿日期

主办单位
中国机械工程学会设备智能运维分会
承办单位
新疆大学
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询