Feasibility Analysis of Aggregation Black-start Source Considering Distributed Resource
编号:28 访问权限:仅限参会人 更新:2024-08-15 10:45:24 浏览:104次 张贴报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
With the large-scale grid integration of renewable energy sources, distributed power sources are difficult to meet the black start requirements due to low inertia and small capacity. For this reason, this paper investigates the black start of distributed renewable energy units and small hydropower units with cooperative participation. Based on the frequency response model, we study the black start strategy of power system considering virtual synchronization control. Simulations based on the IEEE14 node system show that: small hydropower units and renewable energy units cooperatively participate in the black-start process with stable frequency response and meets the security requirements.
关键词
Aggregated black-start source,Frequency response,Virtual synchronization control,hydro unit
报告人
Wenhao Yang
Graduate Student Huazhong University of Science and Technology

稿件作者
Wenhao Yang Huazhong University of Science and Technology
Kaixuan Zhang Huazhong University of Science and Technology
Lufan Zhao Huazhong University of Science and Technology
Fanrong Wei Huazhong University of Science and Technology
Xiangning Lin Huazhong University of Science and Technology
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    11月06日

    2024

    11月08日

    2024

  • 09月15日 2024

    初稿截稿日期

  • 11月08日 2024

    注册截止日期

主办单位
Huazhong University of Science and Technology
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询