A new energy multi-station short-circuit ratio online calculation method based on message passing GCNConv
编号:26 访问权限:仅限参会人 更新:2024-08-15 10:45:24 浏览:137次 口头报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
At present, the short-circuit ratio constraint of multi-station is incorporated into the new energy operation limit check by offline calculation, without considering the influence of new energy power distribution and topological structure on the short-circuit ratio. To solve this problem and implement the online calculation, this paper introduces a new graph neural network framework, called the online short-circuit ratio calculation method of new energy multi-station based on message passing GCNConv. Based on the accuracy guarantee, this method can process the graph structure data of the power system, and through the message passing mechanism, the information of nodes and edges can be efficiently aggregated and disseminated, and the real-time online calculation efficiency can be improved. Finally, the performance of the model is verified by the simulation and comparative analysis of the 109-node system.
 
关键词
New energy; Short-circuit ratio; Online Calculation; Message Passing; Graph Neural Networks.
报告人
Yuchun Yi
student 华北电力大学

稿件作者
Yuchun Yi 华北电力大学
Chenhao Zhu 华北电力大学
Jiajian Lin 华北电力大学
Le Zheng 华北电力大学
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    11月06日

    2024

    11月08日

    2024

  • 09月15日 2024

    初稿截稿日期

  • 11月08日 2024

    注册截止日期

主办单位
Huazhong University of Science and Technology
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询