Research on the Design of Express Bus Line in Metro Service Bottleneck Section: a Case Study of Nanjing, China
编号:84 访问权限:仅限参会人 更新:2022-07-06 12:58:03 浏览:163次 张贴报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
One of the problems facing public transit that the mismatch between metro service capacity and travel demand is becoming serious, especially in some sections with large passenger flow, which has become a bottleneck restricting the development of metro. Under this background, this paper studies the bottleneck section of Nanjing metro service. The following work is mainly done: 1. Proposing a method of using the express bus line to relieve metro passengers. 2. Extracting passenger flow from passengers' card-brush data and assigning it to the metro network to obtain bottleneck sections. 3. Establishing an average saturation model to calculate the most suitable number of express bus stations. The results show that the method can effectively reduce the saturation of cross-section passenger flow in the bottleneck section of the metro and improve passenger travel satisfaction on the basis of ensuring the rational use of metro capacity.
 
关键词
Metro Service Capacity, Bottleneck Section, Express Bus Line, Passenger Flow Relief
报告人
Zheng Wen
Southeast University

发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    07月08日

    2022

    07月11日

    2022

  • 07月11日 2022

    报告提交截止日期

  • 07月11日 2022

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Central South University (CSU)
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询