Based on FAHP Evaluation of Equipotential Method of Live Working on ±800kV UHVDC in Transmission Line in heavy icing area
编号:371 访问权限:仅限参会人 更新:2022-08-29 15:59:33 浏览:109次 张贴报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

视频 无权播放 演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
UHV 800kV DC transmission line is a key power facility for long-distance and large-capacity power transmission. Its operational reliability is important to ensure the operational safety of the sending and receiving terminal power grids, and live working is an important technical means to improve the operational reliability and utilization of the line by eliminating defects in a timely manner. In order to comprehensively evaluate the safety of different equal potential methods of live working of ± 800kV transmission line, this paper analyzes the factors affecting the entry path and establishes a path evaluation model based on the fuzz analytic hierarchy process (FAHP).The optimal and most commonly used entry paths are selected for weight calculation, including the entry mode with the lowest electric field on the body surface (135 ° entry), the entry mode with low arc energy (45 ° entry), and the commonly used ones( The horizontal hanging basket entry and the upper rope ladder access) were compared and calculated. The calculation results show that the 45°hanging basket method is the best path scheme for comprehensive evaluation. The evaluation method can provide data reference for safety protection of ± 800kV UHVDC live working.
 
关键词
±800kV transmission line ;Live working ;Equil-potential Entry-Path ;Safety protection ;FAHP
报告人
王 钰力
三峡大学

稿件作者
王 钰力 三峡大学
黄 梦婷 三峡大学
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    09月25日

    2022

    09月29日

    2022

  • 08月15日 2022

    提前注册日期

  • 09月10日 2022

    报告提交截止日期

  • 11月10日 2022

    注册截止日期

  • 11月30日 2022

    初稿截稿日期

  • 11月30日 2022

    终稿截稿日期

主办单位
IEEE DEIS
承办单位
Chongqing University
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询