Analysis of 750kV Main Transformer High Voltage Side Bushing Faults Based on Multi-Detection Technology
fault analysis,transformer,multi detection,high voltage side bushing
终稿
Xiu Zhou / ;State Grid Ningxia Electric Power Research Institute
Kui Ma / State Grid Ningxia Electric Co.,Ltd.
Shahu 750 kV substation is the hub substation of the northern Ningxia power grid, the station's 750 kV system is directly connected to the 750 kV system of the ±800 kV Shanghaimiao EHV converter station, the reliable operation of the 750 kV main transformer at Shahu Station has a huge impact on the ±800 kV Shanghaimiao EHV DC outgoing transmission. The high voltage side bushing is one of the most important components of the 750 kV main transformer, and in recent years there have been a number of power grid outages caused by the high voltage side bushing of the main transformer, even resulting in a forced shutdown of the DC outgoing transmission. This paper takes the C-phase high-voltage side bushing of the No. 3 main transformer of the Shahu 750 kV substation as an example. Through site investigation and protection recording analysis, the fault site is identified, then the electrical test, physical and chemical test, and simulation analysis are used to clarify the fault mechanism and causes, and finally, the same type of bushing is investigated.



 
重要日期
  • 会议日期

    09月25日

    2022

    09月29日

    2022

  • 08月15日 2022

    提前注册日期

  • 09月10日 2022

    报告提交截止日期

  • 11月10日 2022

    注册截止日期

  • 11月30日 2022

    初稿截稿日期

  • 11月30日 2022

    终稿截稿日期

主办单位
IEEE DEIS
承办单位
Chongqing University
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询