Life-cycle risk analysis for international train supply— A case study between China and Brazil
编号:481 访问权限:仅限参会人 更新:2021-12-03 10:22:27 浏览:106次 张贴报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

暂无文件

摘要
The “One Belt, One Way” initiative focuses on encouraging Chinese companies to invest in other countries and face new challenges. Investment diversification and risk management of overseas investment projects catch the eye of many parts of engineering. Research and exploration of project risk management abroad is increasingly important. This paper considers trade between China and Brazil as an example to analyze the life-cycle risk of international rail investment. The approach aims to analyze project lifecycle risks and promote government, financial, monetary, legal, logistic and partnership risk assessments to ensure that a large passenger train project from China to Brazil meets all requirements. technical, environmental and lead time for long term projects and also profitable for the Chinese company. The proposal is a scientific application of life cycle management, risk matrix study and Monte Carlo simulation, showing the importance of the theory and its tools in the study of different scenarios, providing important collaboration to decision makers when subjected to the risks of project. From the risk analyzes, cost or time-based random samples (random variables) were generated and then "tested" each sample model for an iteration, providing an estimate of the expected time or cost value and the estimated error. The simulations for the 5000 random universes of the selected sample had a minimum value of 836.65 in the worst case (16.33% of the damage compared to the proposed value); and a maximum value of 1,248.08, at worst (23.79% profit over the proposed value). There are still areas for improvement and more risks that need to be explored using the study of other risks and other types of contracts, but the proposal makes an important contribution to proving the feasibility of life cycle application and risk matrix study in long term projects. Keywords: risk analysis, life cycle, risk matrix, Monte Carlo simulation, international train supply.
关键词
CICTP
报告人
Weiya Chen
COMPANHIA PAULISTA DE TRENS METROPOLITANOS

稿件作者
Weiya Chen COMPANHIA PAULISTA DE TRENS METROPOLITANOS
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询