Study on Work Division of Passenger Stations in Hangzhou Railway Hub
编号:408 访问权限:仅限参会人 更新:2021-12-03 10:20:41 浏览:104次 张贴报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

暂无文件

摘要
The Hangzhou railway hub is one of the most important nodes in the national railway network for Yangtze River Delta Economic Zone. With the completion of the South Hangzhou Railway Station reconstructed project and the opening of new lines such as the Hangzhou-Huangshan high-speed railway, the Hangzhou railway hub needs to re-divide the work of passenger stations. This paper sorts out the current situation of the passenger transport system in Hangzhou railway hub, summarizes the existing problems of the hub and the restrictive conditions of work division. Based on the background that all new stations and new lines in the hub plan will be completed on schedule by 2030, this paper puts forward several long-term work division schemes of passenger stations in Hangzhou railway hub, and finally selects a better one by using the fuzzy comprehensive evaluation method, to provide suggestions and opinions for the long-term planning and design of Hangzhou Railway passenger hub.
关键词
CICTP
报告人
Xingfang Xu
1.The Key Laboratory of Road and Traffic Engineering, Ministry of Education. 2.School of transportation engineering, Tongji university

稿件作者
Xingfang Xu 1.The Key Laboratory of Road and Traffic Engineering, Ministry of Education. 2.School of transportation engineering, Tongji university
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询