Train rescheduling for high-speed railway under the influence of multi-disturbances
编号:383 访问权限:仅限参会人 更新:2021-12-03 10:20:09 浏览:103次 张贴报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

暂无文件

摘要
It is one of critical tasks to reschedule timetable timely in high-speed railway (HSR) operation system. Multi-disturbances, i.e., primary delay, speed limitation or blockage of dwell lines, are considered in this paper, where a mixed integer linear programming is formulated based on the alternative graph to minimize the sum of times of changing dwell lines and secondary delay. Therefore, train real-time speeds, train orders, running times and occupations on dwell lines are adjusted and optimized simultaneously. In order to solve this complex model within a limited time, a new-designed solving algorithm applied in an actual case, i.e., timetable of Wuhan-Guangzhou high-speed railway, and it is able to provide an acceptable solution efficiently, and the validity and feasibility are demonstrated as well during the computation process. At last, delay times and frequencies of changing dwell lines caused by different disturbances are computed and analyzed during the experimental tests.
关键词
CICTP
报告人
Peijuan Xu
Chang'an University

稿件作者
Peijuan Xu Chang'an University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询