Research on Optimization of Intercity Railway Train Stop Planning based on Train Scheduling Simulation Evaluation
编号:316 访问权限:仅限参会人 更新:2021-12-03 10:18:41 浏览:128次 张贴报告

报告开始:2021年12月17日 08:44(Asia/Shanghai)

报告时间:1min

所在会场:[P1] Poster2020 [P1T3] Track 3 Vehicle Operation Engineering and Transportation Management

暂无文件

摘要
Aiming to ensure the feasibility of the optimized train stop planning, a novel optimization method is proposed in this paper, which conducts the simulation experiment of train scheduling compilation based on the train stop planning, and then takes the evaluation of train scheduling as the basis of the optimization of train stop planning. Specifically, random interference and the principle of dynamic matching of buffer time distribution and train stop planning are embedded into the simulation experiment to make it closer to the reality. The resources occupied and stability of train scheduling are adopted as the objective function, and passenger demand, number of stops are used as constrains. Genetic algorithm and the resolution strategy of constrains conflict are designed to solve the model. Finally, numerical experiments are implemented based on the operational data of Shanghai-Nanjing intercity railway. The result shows that the optimized train stop planning makes the carrying capacity improved by 8.47% under the premise of ensuring good stability, which verifies the effectiveness and efficiency of the proposed approach.
关键词
CICTP
报告人
yuanyuan lu
Beijing Jiaotong University

稿件作者
yuanyuan lu Beijing Jiaotong University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询