Optimal Planning of Prospective Power Supply Structure Considering Demand Response and Dynamic Generation Cost
编号:145 访问权限:仅限参会人 更新:2022-05-17 09:16:58 浏览:214次 张贴报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
With the wildly concerns on carbon emission around the world, it has become a broad consensus to vigorously develop new energy. The high portion of new energy means great challenge in power balance.  In order to meet the dual requirements of low carbon emission and high power supply reliability, it is of great significance to fully mobilize flexible resources on the load side and reasonably plan the power supply structure. This paper proposes an optimal planning model of prospective power supply structure, in which the demand response and seasonal energy storage have been considered. And the generation cost of various power supplies is divided into three categories, in which the carbon emission cost has been considered. Stochastic production simulation and particle swarm optimization algorithm are adopted to look for the optimal power supply scheme. At last, a case study is conducted to verified the feasibility of the model.
 
关键词
power supply structure;demand response;generation cost;Stochastic production simulation
报告人
ZouYichao
State Grid Fujian Electric Power Company

发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    05月27日

    2022

    05月29日

    2022

  • 02月28日 2022

    初稿截稿日期

  • 05月29日 2022

    注册截止日期

  • 06月22日 2022

    报告提交截止日期

主办单位
IEEE Beijing Section
China Electrotechnical Society
Southeast University
协办单位
IEEE Industry Applications Society
IEEE Nanjing Section
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询