The potential of foamed backfilling in underground mines
mine backfilling, foamed backfill, rheology, defoaming, case studies.
全文录用
Anthony John Spencer Spearing / China University of Mining and Technology
Liqiang Ma / China University of Mining and Technology
Gaofeng Wang / China University of Mining and Technology
David HALLMAN / Applied Geologic LLC
Backfilling is the process whereby waste material (generally metallurgical tailings or prepared aggregate) is placed back underground into open mine workings (stopes). Backfill is typically used for the following applications: as a working platform, an artificial roof, a stope/void filler, an artificial sidewall, a pillar replacement and to limit surface subsidence and adverse damage to water. The most common methods are as a slurry or as a paste. Slurry filling has many transport advantages but has poor post filling performance. Paste filling has high transportation pressures so often needs pumps but has generally good performance once placed. Foamed backfills however have the potential to offer transport advantages and good post placement performance. The main advantage of using foam in backfill is to transport the backfill with low pressure losses then defoam the backfill so it is effectively placed with even less water than in a paste. If the placed backfill does not defoam under its own weight, then a defoaming agent (e.g. diesel) should be added otherwise the placed density is low and this adversely affects the backfill performance (especially if it is also cemented). This paper discusses the potential and gives some examples where foams have been used for underground filling applications.
重要日期
  • 会议日期

    05月26日

    2022

    05月27日

    2022

  • 05月03日 2022

    初稿截稿日期

  • 05月26日 2022

    报告提交截止日期

  • 05月28日 2022

    注册截止日期

主办单位
中国矿业大学
联系方式
历届会议
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询