Backfill placement for the stability of crown and sill pillars in underground mines
Pillar stability, backfill placement, crown and sill pillars, underground mining
全文录用
Jerry Ran / Kinross Gold Corporation
Stability of crown and sill pillars may be required to prevent ingress of water or mud into underground mining zones, constrain the potential caving boundary as part of the permit conditions, protect infrastructure in a local or regional scale or control dilution when the sublevel caving or open stoping methods are adopted for ore extraction in an underground mine. 

Delayed or no placement of fill may cause wall overbreak of mined out stopes or voids and subsequently lead to instability of crown or sill pillars. In particular, when the sublevel caving method is modified to introduce rock fill for supporting walls and as the waste blanket, backfill placement becomes a key factor in wall and pillar stability. In sublevel open stoping, if the filled stopes are interconnected and for various reasons the fill body is able to “flow” or move in a large scale, stability of the walls and pillars may become a concern for the mining operation.

Since crown or sill pillars at a shallow depth are generally under low stresses, their performance is similar to that of surface crown pillars. In cases where numerical modeling is not performed with a high confidence and as a preliminary assessment, the Carter’s scaled span approach is commonly used by engineers to evaluate the crown or sill pillar stability. However, application of the method implicitly assumes that the walls of mined out stopes are generally stable either with introduction of fill or under the allowable stable hydraulic radius.  

In this paper two cases where the modified sublevel caving method is used are presented to highlight the importance in prompt placement of fill in maintaining pillar stability and one case is discussed about the impact of movements of placed fill on pillar stability.  
重要日期
  • 会议日期

    11月21日

    2021

    11月25日

    2021

  • 11月01日 2021

    初稿截稿日期

  • 11月05日 2021

    注册截止日期

主办单位
International Committee of Mine Safety Science and Engineering
承办单位
GIG
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询