139 / 2021-10-05 17:09:41
Influence of changes in longwall panels’ parameters on technology and cost effectiveness
underground coal mining,longwall exploitation,Effectiveness,Economic costs
全文录用
Łukasz Herezy / Lubelski Węgiel "Bogdanka" SA
Sebastian Buczak / Lubelski Węgiel "Bogdanka" SA
Dawid Osowski / Lubelski Węgiel "Bogdanka" SA
Bartosz Rożnawski / Lubelski Węgiel "Bogdanka" SA
The Bogdanka mine, wanting to remain a leader in terms of production and cost-effectiveness, introduces several technical and organizational solutions. Recently, due to the preparations for the exploitation of the new seams, a decision was made to extend the longwall length to over 7 km and the length of the walls from the standard 300 m to 400 m. Changes in the geometric parameters of the longwall panels  resulted in the application of new technical, organizational and technological solutions to optimize the extraction costs. The paper presents examples of the applied solutions along with the impact on the volume of extraction and cost effectiveness.

 
重要日期
  • 会议日期

    11月21日

    2021

    11月25日

    2021

  • 11月01日 2021

    初稿截稿日期

  • 11月05日 2021

    注册截止日期

主办单位
International Committee of Mine Safety Science and Engineering
承办单位
GIG
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询