A risk-constrained model for virtual power plants including DGs and coupled electricity-heat supply
编号:220 访问权限:仅限参会人 更新:2020-11-11 12:10:07 浏览:149次 张贴报告

报告开始:暂无开始时间(12)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

暂无文件

摘要
To exploit the potential of flexibility from demands and distributed energy resources, this paper proposes an optimal bidding and operation strategy for a virtual power plant (VPP) with a coupled electricity-heat supply system including thermoelectric coupling equipment. The objective is to minimize the VPP’s operation cost while balancing the heat and power demand. A scenario-based risk-constrained day-ahead stochastic optimization model is proposed, which considers the renewable power output uncertainty and the risk of operation cost. Furthermore, the real-time optimal operation of the VPP is also considered in the proposed model. Effectiveness of the proposed strategy is demonstrated by simulation results.
关键词
Conditional value-at-risk,coupled electricity-heat supply,electricity market,virtual power plant
报告人
Zechun Hu
Tsinghua University

稿件作者
Danyang Zhang Tsinghua University
Zechun Hu Tsinghua University
Xuanyuan Wang State Grid Jibei Electric Power Company
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    10月21日

    2019

    10月24日

    2019

  • 10月13日 2019

    摘要录用通知日期

  • 10月13日 2019

    初稿截稿日期

  • 10月14日 2019

    初稿录用通知日期

  • 10月24日 2019

    注册截止日期

  • 10月29日 2019

    终稿截稿日期

承办单位
Xi'an Jiaotong University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询