Control Optimization of PMSG Based WECS with Modified PLL and DC-link Voltage Relaxation
编号:205 访问权限:仅限参会人 更新:2020-11-11 12:10:04 浏览:149次 张贴报告

报告开始:暂无开始时间(12)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

暂无文件

摘要
Recently offshore wind power have developed rapidly. As the mainstream generator of offshore wind farm, permanent magnet synchronous generator (PMSG) has been increasingly applied in offshore wind farm. The operating performance of PMSG based wind energy conversion system (WECS) depends on the performance of control system, which relies on the accurate measurement of phase-locked loop (PLL). This paper propose a modified PLL scheme to improve system stability. A DC-link voltage relaxation control strategy is also applied to obtain a fast response and lower over-voltage level, which can lead to better control performance and reduced cost. Small signal stability analysis as well as simulation results verified that the optimized system have greater stability and better performance.
关键词
PLL,WECS,Voltage relaxation,Small signal stability analysis
报告人
Yichao Zou
Xi'an Jiaotong University

稿件作者
Yichao Zou Xi'an Jiaotong University
Yongqing Meng Xi'an Jiaotong University
Jin Li Xi'an Jiaotong University
Ying Kong Xi'an Jiaotong University
Rong Ye State Grid Fujian Electric Power Company
Zhangsui Lin State Grid Fujian Electric Power Company
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    10月21日

    2019

    10月24日

    2019

  • 10月13日 2019

    摘要录用通知日期

  • 10月13日 2019

    初稿截稿日期

  • 10月14日 2019

    初稿录用通知日期

  • 10月24日 2019

    注册截止日期

  • 10月29日 2019

    终稿截稿日期

承办单位
Xi'an Jiaotong University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询