With the large-scale access of distributed generation in distribution network,operation control of distribution network faces new challenges. Active distribution network is not to distribute electric energy passively,but to achieve coordinated optimization of source-network-load through active management. Considering different types of distributed energy such as controllable distributed generation,energy storage devices and flexible loads in active distribution network management, a day-ahead optimization model of active distribution network is established. Taking the day-ahead 24 hours active power output of the distributed generation as the optimization variable, and the minimum operating cost of the power company as the objective function, the model can realize the maximum absorption of distributed generation and the economical and efficient operation of distribution network. The model is solved by means of adaptive particle swarm algorithm and verified by a modified IEEE 33-node distribution network.
关键词
Active distribution network, distributed generation, operation optimization, particle swarm algorithm
报告人
Jianfang LI
Senior Engineer China Electric Power Research Institute

稿件作者
Jianfang LI China Electric Power Research Institute
Xiaohui Song China Electric Power Research Institute
Yu Zhang China Electric Power Research Institute
Fei Gao China Electric Power Research Institute
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    10月21日

    2019

    10月24日

    2019

  • 10月13日 2019

    摘要录用通知日期

  • 10月13日 2019

    初稿截稿日期

  • 10月14日 2019

    初稿录用通知日期

  • 10月24日 2019

    注册截止日期

  • 10月29日 2019

    终稿截稿日期

承办单位
Xi'an Jiaotong University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询