Research on power restoration overvoltage of no-load line in high voltage network
编号:172 访问权限:仅限参会人 更新:2020-11-11 12:09:55 浏览:161次 张贴报告

报告开始:暂无开始时间(12)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

暂无文件

摘要
The research of power system restoration is an important subject to ensure the fast, safe and stable restoration of power fault area. Overvoltage verification during power line restoration is the key step to ensure the feasibility of power service restoration scheme. In order to solve the problem of overvoltage in the process of power service restoration process, a detailed simulation model is established by using the simulation software MATLAB/Simulink to study the influencing factors of the overvoltage amplitude at the end of the line when the backbone-grid restores power supply. A large number of simulation results show that the length of unloaded line and non-simultaneous closing of the three phases and asynchronous close of circuit breaker have significant influence on the amplitude of overvoltage at the end of transmisson line. Based on the simulation results, considering the characteristics of the backbone power supply system, the effect of load closing at the end of the line on reducing overvoltage is studied. The results show that proper load closing at the end of transmission line can not only effectively reduce the transient overvoltage at the closing moment of unloaded line and suppress the power frequency overvoltage at the end of line, but also make the simulation waveform more stable and more conducive to eliminating burr phenomenon through load control when switching unloaded line.
关键词
MATLAB/Simulink,power supply recovery,Overvoltage,Closing no-load circuit,Load calculation,MATLAB/Simulink
报告人
Liu Zhijian
Kunming University of Science and Technology, Faculty of Electric Power Engineering

稿件作者
Yu Jin Kunming University of Science and Technology, Faculty of Electric Power Engineering
Liu Yajin Kunming University of Science and Technology, Faculty of Electric Power Engineering
Liu Zhijian Kunming University of Science and Technology, Faculty of Electric Power Engineering
Xu Hui Kunming University of Science and Technology, Faculty of Electric Power Engineering
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    10月21日

    2019

    10月24日

    2019

  • 10月13日 2019

    摘要录用通知日期

  • 10月13日 2019

    初稿截稿日期

  • 10月14日 2019

    初稿录用通知日期

  • 10月24日 2019

    注册截止日期

  • 10月29日 2019

    终稿截稿日期

承办单位
Xi'an Jiaotong University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询